Puente de Piedra de Grecia: a natural arch that deserves a real bridge.

Writer: Hámer Salazar (D.H.C.)
Hámer Salazar (D.H.C.)
6 days ago
8 min read

Few things in Grecia inspire as much affection and curiosity as the Puente de Piedra (Stone Bridge). It gives our district its name, features in one of the country’s most beloved legends, and yet many people from the district itself walk across it without even realizing it. A few years ago, I wrote about this place, and it was one of the most-visited pages on our previous website. Today I’m writing about it again because the issue remains relevant: the arch continues to bear the weight of vehicular traffic, and its protection is still pending.

In this article, I’ll explain what the Puente de Piedra really is, why I’m concerned about it, what we’ve done at FUNDEMA-PP, and what we propose for its future.

The Legend: The Peasant, the Devil, and the Rooster

Tradition has it that, during the colonial era, a local peasant struggled to transport his crops from one bank of the Poró River to the other. One night, the Devil appeared to him and offered to build a bridge in exchange for his soul. The farmer agreed, but cunningly set a condition: the work had to be finished before the rooster crowed.

The Devil set to work and made such rapid progress that the farmer began to worry. Late at night, he lit a candle in front of the rooster, and the rooster, thinking dawn was breaking, crowed. The Devil had just one stone left to place; he dropped it and left without finishing the bridge and without the farmer’s soul. That gap at the top of the arch is, according to legend, the stone that never made it into place.

There are other versions. One, compiled by Professor Iveth Jiménez Quesada and published in the newspaper Occidente in 1978, sets the story among Corobicí indigenous people who grew corn on both sides of the river. They all share the same underlying theme: popular ingenuity explaining an astonishing natural phenomenon. This legend is an intangible cultural heritage of immense value, both for Grecia and for Costa Rica.

This story has been with me my whole life, and I’ve always wanted to share it beyond Grecia. That’s why I made it the starting point for a book: El puente del Diablo y otras historias de terror (The Devil’s Bridge and other Horror Stories - only available in Spanish at the moment). There are thirteen interconnected stories that begin at the Stone Bridge, starting with Chevo’s pact with the Devil in 1723, and feature other characters from our oral tradition, such as La Llorona and the oxless cart. The settings are real; what happens in them, however, doesn’t always have an explanation. (The book is available at Librería Internacional and on Amazon, in paperback, Kindle, and audiobook formats)


What science says: a rock arch, not a bridge

The geological explanation is no less fascinating. In 2003, a team from the Central American School of Geology at the University of Costa Rica (UCR) studied the site and reconstructed its history:
  • The base consists of volcanic breccias from the ancient Aguacate Group, dating back about 5 million years.

  • The arch was formed from material in enormous pyroclastic flows (the so-called fiery clouds) that occurred between 390,000 and 320,000 years ago and were associated with the explosion of the Barva volcano’s caldera. These flows reached temperatures exceeding 600 °C.

  • As it cooled slowly, that material formed ignimbrites: elongated rocks in the shape of prismatic columns with four to eight sides, arranged side by side without any cement to bind them together.

  • The sculptor was the Poró River. Over time, it eroded the softer tuff at the base and carved out the passage through which the water flows today.

Geologists at the UCR summed it up with an idea I fully agree with: nature did not build a bridge to cross the river, but rather an arch for the river to pass through the rock. It is one of the few natural arches of this type in the world and, as far as we know, the only one of volcanic origin that is used as part of the road network. In other countries, formations like this are protected tourist attractions.

Why I’m concerned

  1. It’s not an engineering structure

A real bridge has blueprints, foundations, abutments, beams, load calculations, and a maintenance plan. The Stone Bridge has none of that. At first, people crossed it on foot; then oxcarts and horse-drawn carriages; and over the years, light vehicles and farm machinery. Later, it turned out to be easy and inexpensive to lay down a layer of asphalt and install a railing.So now we have something that looks like a bridge, but anyone crossing it doesn’t know that there’s no structure underneath designed to support it. Furthermore, the road is single-lane and curves, which increases the risk of a collision.

2. It is a fragile structure

The ignimbrite columns do not form a compact rock. They are loose pieces, side by side, and the vibration from traffic can cause them to break off. In fact, the frequent detachment of parts of the arch has been publicly reported.

The UCR study concluded that the base of the arch currently has a safe load-bearing capacity, but that the quality of the fractured rock mass is poor or very poor and requires some form of support. The geologists themselves recommended evaluating an alternate route with its own bridge, because the arch is not suitable for vehicular traffic.

3. What LanammeUCR Found

In 2014, the National Laboratory of Materials and Structural Models (LanammeUCR) assessed the condition of the arch, including using a LiDAR scanner. Among its findings:

  • Erosion by the Poró River and a natural drainage channel has created a hole that runs through one side of the foundation and could destabilize the ignimbrites.

  • Water seepage from the road surface is deteriorating the rock.

  • Tree and plant roots are growing between the columns, widening the fractures and causing rockfalls.

  • In October 2014, an average of about 2,577 vehicles per day passed through: 81% were light vehicles, nearly 14% were motorcycles, and just over 5% were heavy vehicles, mainly buses and likely trucks from nearby quarries.

Lanamme warned that an increase in traffic in the future could have direct consequences for the preservation of the arch. Such an increase is precisely what we expect with the canton’s growth and the arrival of new businesses.

4. An Inappropriate Designation

In 1994, through Executive Decree No. 23111-C, the arch was designated Historical-Architectural Heritage, largely due to the power of the legend. I appreciate the gesture, but the designation is inappropriate: it is not an architectural work, because human beings did not play a role in its formation, nor did any significant events in human history take place there. Its true value lies in the natural history and the intangible cultural heritage that surrounds it.

There is something else. As a geological formation, the arch is part of the state’s natural heritage. Just as permits from the Ministry of Environment and Energy (MINAE) are required to operate a quarry or a mine, I believe the Municipality should have a permit to use this arch as road infrastructure. That permit does not exist.

What we have done

The concerns of Grecia’s residents regarding this site date back many years. Through FUNDEMA-PP, we have persistently pursued formal channels:

  • July 28, 2022. We sent the Municipal Council official letter FUNDEMA REF. 05-2022 regarding the canton’s bridges. Regarding the Stone Bridge, we requested that heavy vehicle traffic be restricted as a provisional measure and asked for the Municipality’s action plan and timeline to cease using the arch as a vehicular bridge. Letter from FUNDEMA to the Municipality regarding bridges

  • August 4, 2022. The City Council reviewed our official letter during its Regular Session (Minutes 181, Article V, Section 4), and the Secretary’s Office forwarded it to the mayor via official letter SEC-4040-2022 dated August 12. Council’s Response, SEC-4040-2022

  • 2023. A resident filed a petition for constitutional protection, which the Constitutional Chamber granted, compelling the Municipality to take action to prevent further deterioration.

  • November 2023. We submitted a proposal to create the Puente de Piedra Urban Nature Park, which I describe below.

Despite all this, there has been little concrete progress. That is why I continue to write and speak about this issue.

Our Proposal: the Puente de Piedra Urban Natural Park

In 2019, Executive Decree No. 42742-MINAE established a new management category, the Urban Natural Park (PANU), designed to protect at-risk urban ecosystems and forests. We propose using this designation to create the PANU Puente de Piedra (PANU-PP) in Rincón de Salas, as a public park operated by the Municipality of Grecia in partnership with MINAE, the Ministry of Culture, and nongovernmental organizations.

Five reasons to do this

  1. Traffic safety. Those who travel there deserve a bridge designed for that purpose.

  2. Cultural heritage. The legend deserves a space where it can be told and celebrated.

  3. Natural heritage. A unique volcanic arch that almost no one can appreciate today, because there is nowhere to stop and view it from the side or from below.

  4. El Achiote Biological Corridor. The park would strengthen ecological connectivity and provide habitat and safe passageways for the region’s flora and fauna.

  5. Environmental and cultural education. An outdoor classroom on geology, biodiversity, and local identity.

Objectives

  • Build a civil engineering structure to replace the arch as a bridge.

  • Conserve and restore the natural rock arch.

  • Promote cultural activities that spread awareness of the legend.

  • Conserve and restore the site’s natural habitats.

  • Establish safe wildlife crossings and connect forest patches.

  • Develop environmental education programs for residents and tourists.

  • Promote responsible ecotourism that benefits the local economy.

  • Precisely define the park’s boundaries, respecting the rights of stakeholders.

A Four-Year Plan

We propose implementing the project over the course of one local government term, in three phases:

Urgent Actions

  • Prohibit the passage of articulated trucks and regulate that of heavy vehicles.

  • Install signage.

  • Control vegetation on the arch and properly channel stormwater.

Medium Term

  • Conduct studies and promote legislation to designate the site as an Urban Natural Park, defining which entities will manage it and under what model.

  • Study land tenure and define the boundaries, which could include the site of the canton’s former landfill.

  • Design the new bridge and a master plan for conservation and tourism.

  • Secure funding for land acquisitions, civil engineering projects, and conservation work.

Long Term

  • Build the new bridge.

  • Implement the arch restoration plan, with support from the UCR School of Geology.

  • Execute the master plan for the area.

A Real Bridge

Protecting the arch necessarily involves building a real bridge next to it. I envision a structure with two lanes for vehicles, a bike path, and sidewalks on both sides for pedestrians. Wider on the side facing the arch so that it also functions as a viewing platform. For the first time, residents of Grecia and visitors alike could safely stop to admire what nature took hundreds of thousands of years to sculpt.

The arts, design, and architecture firm ESFERA S.A. created an animation showing what this proposal might look like:


Back to the site

Caring for Puente de Piedra also means rolling up our sleeves. On September 26, 2026, we joined neighbors and organizations from across the canton for a cleanup day along the trails leading to this beautiful site.We collected 96 kilos of trash that will no longer end up in our rivers. You can read about how we spent that morning here: United for a Cleaner Canton! Here’s How We Spent the Cleanup Day at Puente de Piedra, Grecia

I invite you to visit the Puente de Piedra, to see it with fresh eyes, and to join this cause. An arch that has stood for hundreds of thousands of years shouldn’t be lost simply because a real bridge wasn’t built in time.

Documents for reference

M.Sc. Hámer Salazar Rodríguez Founder and President, Foundation for Development in Balance with the Environment (FUNDEMA-PP) Acting locally, thinking globally.


 
 
 

Comments


Grecia, Costa Rica

FUNDEMA-42.png

FUNDEMA-PP

Grecia, Costa Rica

  • LinkedIn
  • Instagram
  • Facebook
Primates de Grecia Logo Tipo Blanco.png

Primates de Grecia

Grecia, Costa Rica

  • Facebook



Privacy Policy

Accessibility Statement
 

PERSONA JURÍDICA: 3-006-884490

© 2026 MariMundo.

bottom of page